CST 120 Ton Ironworker

CST 120 Ton Ironworker

The Industrial Heavyweight

Your 120 Ton Ironworker comes equipped with the following features:

  • Punch station with pedestal die table - uses 219 punch and 413 die
  • Fully guarded
  • Adjustable steel strippers
  • Fully charged hydraulic system
  • Electric stroke control
  • Shear blades reversible for extra long life
  • 3 LED lights installed in shearing station
  • Low rake angle on shear blades
  • Remote foot pedal operation
  • Coper notcher standard in rear station
  • Direct drive pump

CST 120 Ton Ironworker

Image Description Part No. Availability Price Quantity Purchase
120 Ton 3 Phase 208V CST-IW120-3PH208 2 Weeks $42,229.00
120 Ton 3 Phase 208V with PowerLink System CST-IW120-3PH208-AC900 2 Weeks $43,919.00
120 Ton 3 Phase 230V CST-IW120-3PH230 2 Weeks $42,229.00
120 Ton 3 Phase 230V with PowerLink System CST-IW120-3PH230-AC900 2 Weeks $43,919.00
120 Ton 3 Phase 380V CST-IW120-3PH380 2 Weeks $42,969.00
120 Ton 3 Phase 380V with PowerLink System CST-IW120-3PH380-AC900 2 Weeks $44,659.00
120 Ton 3 Phase 460V CST-IW120-3PH460 2 Weeks $42,859.00
120 Ton 3 Phase 460V with PowerLink System CST-IW120-3PH460-AC900 2 Weeks $44,559.00
120 Ton 3 Phase 575V CST-IW120-3PH575 2 Weeks $43,499.00
120 Ton 3 Phase 575V with PowerLink System CST-IW120-3PH575-AC900 2 Weeks $45,189.00
120 Ton Single Phase 230V CST-IW120-1PH230 2 Weeks $35,799.00
120 Ton Single Phase 230V with PowerLink System CST-IW120-1PH230-AC900 2 Weeks $37,399.00